Arnold, MD
Read MoreBay Engineering, Inc. was the engineer of record for a tear down and rebuild of the TEEL building on the upper school campus. Bay Engineering, Inc. worked with Hord, Coplan, Macht to provide all surveying and engineering services to demolish a portion of the TEEL Academic Center, reconstruct a new 3-story addition and renovate the remaining existing structure. Bay Engineering, Inc. provided surveying services to map all existing features for the entire campus due to the location of the construction within the Chesapeake Bay Critical Areas, requiring tight impervious area and stormwater management limitations. Services included site planning, layout and design of site improvements to walks, interconnection to existing buildings and trails, stormwater management features including micro-bioretention areas and landscape/hardscape courtyard features. Bay Engineering, Inc. also provided planning, design and permitting services for a temporary classroom trailer campus for learning cottages during reconstruction of the TEEL Academic Center. Bay Engineering, Inc. provided all site permitting services for Anne Arundel County and Maryland Department of the Environment permits for both projects. During construction, Bay Engineering, Inc. provided construction services including survey stakeout, engineering inspections and asbuilts for Anne Arundel County security release.
Read MoreBay Engineering performed professional services for the addition located on the northeastern corner of the Severna Park Elementary School. The permanent addition was a one-story structure with an enclosed connection to the main school. A limited property boundary survey was completed for the school property to tie down the property line along the western edge of the property, where parking lot access driveway improvements were needed to minimize the pinch point that occurred with the daily traffic flow. The project was designed under the newer 2007 MDE SWM regulations providing the ESD to the MEP.
Read More