Bay Engineering performed professional services for the addition located on the northeastern corner of the Severna Park Elementary School. The permanent addition was a one-story structure with an enclosed connection to the main school. A limited property boundary survey was completed for the school property to tie down the property line along the western edge of the property, where parking lot access driveway improvements were needed to minimize the pinch point that occurred with the daily traffic flow. The project was designed under the newer 2007 MDE SWM regulations providing the ESD to the MEP.
Read MoreBay Engineering, Inc. performed professional services for an approximate 10-acre property zoned R-5. This site was developed as an assisted living facility, Spring Arbor. It consists of 80 units. This project required obtaining a Special Exception for its type of use in R-5 zoning. Water and sewer were extended within the site to serve the facility. Stormwater management is treated by a combination of permeable pavement and bioretention areas, as well as the retrofit of an existing pond for water quantity. These ESD practices were implemented to the MEP as required by the state and county.
Read More