Posts tagged parking lot access improvements
Severna Park Elementary School

Bay Engineering performed professional services for the addition located on the northeastern corner of the Severna Park Elementary School.  The permanent addition was a one-story structure with an enclosed connection to the main school.  A limited property boundary survey was completed for the school property to tie down the property line along the western edge of the property, where parking lot access driveway improvements were needed to minimize the pinch point that occurred with the daily traffic flow.  The project was designed under the newer 2007 MDE SWM regulations providing the ESD to the MEP.

Read More